With EPC general contracting by HFEC, the 40, 000 Nm3/h hydrogen production installation can use ROG as the raw material to prepare the hydrogen with the high purity of 99.99%, and naphtha was taken into the consideration to be used as the raw material during the design. The intermediate delivery of this project was completed in Aug 2012. The picture shows the hydrogen generation reforming furnace.