Current Position::Home >> Business Outlines >> Key Project >>

Xianglu Petrochemicals 4.5 million T/YPTA project

     

     

    Designed by HFEC, invested by Taiwan businessmen, approved by NDRC and Ministry of Commerce, Xianglu Petrochemicals 4.5 million T/YPTA project is one of the key construction projects in Fujian with a total investment of 4.967 billion Yuan. Located at GuleiPeninsula, ZhangpuCounty, Zhangzhou City, Fujian, this project has the largest single line capability in the world at present with an annual PTA capability of 4.5 million tons when completed. This project adopted the strictest domestic environmental protection control standard and the advanced environmental technology in the world currently, and was provided with full scale emergency measures of safety and environmental protection. At preset, this project has been listed into national petrochemical industry restructuring and revitalization planning.

久久午夜无码鲁丝片午夜精品