Taking local brown coal that can be easily obtained at lower price as the raw material, applying to the advanced domestic and foreign technology of production of urea by carbon dioxide stripping process, this project can reduce the comprehensive energy consumption by more than 20% compared with the traditional process. The project is constructed at two phases with two productive lines, of which the size of Phase I is comprised of 700,000 T/Y synthetic ammonia and 1.2 million T/Y urea, being the largest monocase urea project in the world. Located at the Economic Development Zone in